My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 11:01:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transfer station. An access road extends to the fill areas. A perimeter road extends to all of the <br /> monitoring facilities. <br /> 7.1.5 Sanitary Facilities <br /> Permanent restrooms are located in the Employee/1V4aintenance Building and in the scale house. <br /> The restrooms in the Employee/Maintenance Building are equipped with sinks and showers. The <br /> restroom in the scale house is equipped with a sink. In addition, there are several portable toilets <br /> located throughout the site for use by employees, contractors, and the general public. The <br /> wastewater from the permanent restrooms is discharged into an on-site septic tank, which is <br /> pumped periodically by a private septic waste hauler. <br /> 7.1.6 Potable Water Supply <br /> A water well at the landfill supplies potable water. The well is located south of the Employee/ <br /> Maintenance Building. <br /> 7.1.7 Communications and Early Warning Systems <br /> Communications at the site are conducted with the use of two-way radios. Hard wired phones <br /> and fax machines are located in the scale house, the recycling center, and in the <br /> Employee/Maintenance Building. In addition, site managers and other key personnel are <br /> provided with cell phones as needed. <br /> 7.1.8 Lighting <br /> Permanent lighting is used after dark and is located at all buildings including the scale house, <br /> Employee/Maintenance Building, and fire pump house as well as on light poles around the <br /> buildings and at the entrance to the site. <br /> 7.1.9 Safety Equipment <br /> All site personnel are required to wear the following County issued personal protection <br /> equipment(PPE): <br /> • Hard hat <br /> North County RC&SL Page 34 of 48 Public Works/Solid Waste <br /> JTD County of San Joaquin—November 30,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.