Laserfiche WebLink
inspections, verifications, audits, and evaluations of materials and workmanship necessary to <br /> assess and document the quality of the facility closure. <br /> A CQA Plan will be submitted with the Final Closure/Postclosure Plan. <br /> 8.2 POSTCLOSURE MAINTENANCE <br /> 8.2.1 Postclosure Schedule <br /> The NCRC&SL will continue post closure maintenance for 30 years subsequent to landfill <br /> closure. <br /> 8.2.2 Postclosure Cost <br /> The postclosure cost estimate is shown in Table 7. The costs include: <br /> • Cover Repair <br /> • Leachate collection maintenance and monitoring <br /> • Landfill gas monitoring <br /> • Groundwater monitoring <br /> • Landfill gas extraction system operation and maintenance <br /> • Inspections <br /> 8.3 FINANCIAL ASSURANCE <br /> San Joaquin County submits, on a yearly basis, a letter to the regulatory agencies that includes <br /> current dollars in their Closure/Postclosure Fund. The most recent letter was submitted in May <br /> of 2004. At that time the County had approximately $1,114,680 in their North County Landfill <br /> Closure Reserve. A copy of this letter is attached in Appendix I. <br /> North County RC&SL Page 46 of 48 Public Works/Solid Waste <br /> JTD County of San Joaquin—November 30,2004 <br />