Table 6
<br /> Preliminary Closure Cost Estimate
<br /> North County Recycling Center and Sanitary Landfill
<br /> San Joaquin County, California
<br /> Items Quanti Units Unit Cost Subtotals
<br /> FINAL COVER SOIL
<br /> 1 Preparation of landfill to receive cover(final grading) 185 ACRE $100 $19,000
<br /> 2 Evapotranspiration Layer(on-site soils) 895,400 CY $2 $1,791,000
<br /> ACRE $2,000 $370,000
<br /> 3
<br /> Vegetation 185
<br /> g
<br /> L2,180,000
<br /> 00
<br /> I::s:zn:,,i:::Ye3i':eie ,:.:I.:..:.>al.._:::'s::s::'•.r:.»:�.r:.ru::...�.0
<br /> Final Cover Soil Subtotal
<br /> MONITORING SYSTEM
<br /> 4 Landfill Gas Monitoring System $20,000
<br /> 5 Groundwater Monitoring System $21,000
<br /> ......... $5,000
<br /> Leachate Control System 46,000
<br /> $
<br /> Monitoring in Systems
<br /> Subtotal
<br /> GAS CONTROL
<br /> 7 Disabling and Rebuilding Gas System $990,000
<br /> :.
<br /> $255,000
<br /> 8 Addition System
<br /> i:...; .
<br /> $1,245,000
<br /> ;
<br /> .,..:......::....,...........,......;:.:...:.....:........::.::€€ €€s �lil lis€€i;s';;�;s€€
<br /> Gas Control S stem Subtotal ,:..,;I;.::.,:.::.:.:..:.:...............
<br /> SITE IMPROVEMENTS
<br /> 9 Drainage Structures $50,000
<br /> 10 Security Measures $88,000
<br /> 11 Survey Monuments $36,000
<br /> $150,000
<br /> 12 Dismantic Structures
<br /> Decommission Environmental Monitoring System $0
<br /> 13
<br /> 0
<br /> 3
<br /> 24 00
<br /> veme
<br /> nt Subtotal
<br /> Site Improvement ro
<br /> ...::......
<br /> PROFESSIONAL SERVICES $100,000
<br /> 14 Engineering(Design and Bid Documents) $18,000
<br /> 15 Topographic and Boundary Survey $119,000
<br /> 16
<br /> Construction Quality Assurance
<br /> :;.
<br /> ,i. 00
<br /> 70
<br /> 'ri?iii1'iHbt_iiiii!:::-.::!::::!:!::!::.�s::::,:�:r.'�::....,,.�,".. ,
<br /> Professional Services Subtotal "" "" """
<br /> .... ...:::.:.:,::::..
<br /> $4,780,000
<br /> TOTAL ESTIMATED CLOSURE COST
<br /> $956,000
<br /> CONTINGENCY(20%)
<br /> TOTAL $55,,736736,,000
<br /> sf=Square Foot
<br /> CY=cubic yard
<br /> LS=lump sum
<br /> All Costs are in 2004 dollars.
<br /> FINAL COVER-Assume EI cover 3 feet thick.
<br /> MONITORING SYSTEM
<br /> 4 Assume three new gas monitoring wells will be installed. Each will consist of 3 probes(Cost per Spectrum Exploration).
<br /> 5 Assume two new groundwater monitoring wells will be installed. In addition,this cost should cover repairs to all of the wells
<br /> at closure(cost per Spectrum Exploration).
<br /> 6 It is anticipated that the leachate system will be installed as each module is constructed. However,this cost will cover any
<br /> additional repairs or additional sumps,as needed.
<br /> GAS CONTROL-Assume the cost to install the system is$3.3 million. This would be installed during the active life of the
<br /> landfill. At closure,it was assumed that approximately 1/3 of the system will need to be rebuilt plus an additional 17 acres
<br /> constructed.
<br /> SITE IMPROVEMENT
<br /> 9 Drainage Structures consist of perimeter ditching and natural finished drainage contours on the landfill surface.
<br /> 10 Fencing will be placed around the entire site as it is developed. Should the landfill close at tany time,the cost for closure
<br /> includes approximately 2,500 feet. Assume aluminized steel,3 strands,8 feet high.
<br /> 11 Assume 6 survey monuments.
<br /> 12 Structures to be removed include the scalehouse,office and maintenance buildings. These account for 43,210 sf(based on
<br /> 1990 PCPC Plan)Demolition cost assumes buildings on 4"concrete slab(R S Means,2004).
<br /> 13 Dismantling of environmental control system will be included in the post-closure costs.
<br /> PROFESSIONAL SERVICES
<br /> 14 Assume engineering costs= 1%of Services(R S Means,2004).
<br /> 15 Assume conventional topographical survey+aerial surveying at 1'intervals. Cost based on maximum topographic curvey
<br /> cost per R S Means,2004.
<br /> 16 CQA costs are estimated as 5%of cover material placement.
<br /> North County RC and SL Public Works/Solid Waste
<br /> JTD County of San Joaquin-November 30,2004