Laserfiche WebLink
C <br />I I <br />0 <br />C' <br />C <br />h <br />0 <br />n <br />r - <br />I <br />2. Transmittal forms and each page of the submittal shall have a submittal <br />number. <br />3. Sequentially number the transmittal. Resubmittals shall have the original <br />number with an alphabetic suffix (A, B, C, etc.) to indicate the sequence of <br />the resubmittal. <br />4. Each submittal shall indicate the intended use of the item in the Work. <br />When catalog pages are submitted, applicable items shall be clearly <br />identified. The current revision, issue number, and data shall be indicated <br />on all drawings and other descriptive data. <br />5. The Contractor shall submit a list of submittals showing number, title and <br />date submitted. <br />B. Check of Returned Submittals and Waiver of CIaims: Contractor shall check and <br />review the submittals returned for correction and ascertain whether the required <br />corrections result in extra cost above that included in the Contract, and shall give <br />written notice to the Engineer within 5 working days if, in the Contractor's <br />opinion, extra costs result from corrections. The Contractor's failure to give such <br />written notice or the starting of the Work covered by returned submittal <br />'constitutes a waiver by the Contractor of claims for extra costs resulting from <br />required corrections. <br />C. When the drawings and data are returned marked "AMEND AND RESUBMIT" <br />or "REJECTED, SEE REMARKS," the corrections shall be made as noted <br />thereon and as instructed by the Engineer and five (5) corrected copies <br />resubmitted. <br />D. When corrected copies are resubmitted, the Contractor shall, in writing, direct <br />specific attention to all revisions and shall list separately those revisions made <br />other than those called for by the Engineer on previous submissions. <br />E. The need for more than one resubmission, or another delay in obtaining the <br />Engineer's review of submittals, will not entitle the Contractor to extension of the <br />Contract Time unless delay of the Work is directly caused by a change in the <br />Work authorized by a Change Order or by failure of the Engineer to review a <br />submittal within the submittal review period set forth herein and to return the <br />submittal to the Contractor. <br />North County LFG Collection System 2 SUBMITTALS <br />San Joaquin County Public Works Section 01300 <br />