Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />B. At least every 15 calendar days the schedule shall be revised by the Contractor as <br />necessary to reflect changes in the progress of the Work. The schedule shall <br />include mobilization, well drilling, LFG flare skid delivery, trenching, and pipe <br />construction. <br />A. The Contractor shall prepare and include red -line drawings and survey records in <br />the Operation and Maintenance Manual. <br />B. Red -line drawings are to be maintained and updated onsite by the Contractor <br />during construction. <br />1.15 OPERATION AND MAINTENANCE MANUAL FOR LFG FLARE STATION <br />A. Contractor shall submit five copies of the Operation and Maintenance Manual to <br />the County at the conclusion of the work in accordance with Section 01730. <br />A. As described in Section 7.1.02, the Contractor shall transmit a Health and Safety <br />plan prior to the start of the work and within 10 days after the award of the contract. <br />PART 2 MATERIALS <br />The following materials require submission for approval <br />A. Concrete and/or asphalt mixes <br />B. License of surveyor <br />C. Pipe supports <br />D. HDPE pipe welding certificates of those individuals that will be welding the pipe <br />E. Valves <br />F. LFG Flare and associated submittals as specified <br />G. Condensate sumps <br />North County LFG Collection System <br />San Joaquin County Public Works <br />5 <br />SUBMrFrALS <br />Section 01300 <br />