My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />L <br />C <br />u <br />u <br />0 <br />n <br />0 <br />0 <br />11 <br />Ci <br />u <br />1.08 QUALITY <br />A. The Contractor shall mail submittals. Faxed submittals are not acceptable. <br />1.09 PROGRESS REPORTS <br />A. The Contractor shall furnish a progress report to the Engineer with each <br />application for progress payment. If the Work falls behind schedule, the <br />Contractor shall submit additional progress reports at such intervals as the <br />Engineer may request. <br />B. Each progress report shall include sufficient narrative to describe current and <br />anticipated delaying factors, their effect on the construction schedule, and proposed <br />corrective actions. A Work reported complete, but which is not readily apparent as <br />complete to the Engineer, must be substantiated with satisfactory evidence. <br />1.10 MANUFACTURER'S INSTRUCTIONS <br />A. This subsection is related to Section 01730 of these specifications. <br />1.11 PRE -INSTALLATION MEETINGS <br />A. The Contractor shall notify the Engineer and the County in writing about the time <br />and place of such meetings. Such notice shall be two business days prior to <br />installation. <br />1.12 DELIVERY, STORAGE, AND HANDLING <br />A. The Contractor shall submit a delivery schedule for the piping, valves, flare, <br />blower skid and electrical panels - <br />1. 13 <br />anels_ <br />1.13 SCHEDULING <br />A. Before Work is started, the Contractor shall submit to the Engineer for review a <br />schedule of the proposed construction operations. The construction schedule shall <br />indicate the sequence of the Work indicating the time of completion of each <br />component of the Work. Schedule shall show work done on site throughout the <br />Contract working days. <br />North County LFG Collection System 4 SUBMITTALS <br />San Joaquin County Public Works Section 01300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.