Laserfiche WebLink
C <br />L <br />C <br />u <br />u <br />0 <br />n <br />0 <br />0 <br />11 <br />Ci <br />u <br />1.08 QUALITY <br />A. The Contractor shall mail submittals. Faxed submittals are not acceptable. <br />1.09 PROGRESS REPORTS <br />A. The Contractor shall furnish a progress report to the Engineer with each <br />application for progress payment. If the Work falls behind schedule, the <br />Contractor shall submit additional progress reports at such intervals as the <br />Engineer may request. <br />B. Each progress report shall include sufficient narrative to describe current and <br />anticipated delaying factors, their effect on the construction schedule, and proposed <br />corrective actions. A Work reported complete, but which is not readily apparent as <br />complete to the Engineer, must be substantiated with satisfactory evidence. <br />1.10 MANUFACTURER'S INSTRUCTIONS <br />A. This subsection is related to Section 01730 of these specifications. <br />1.11 PRE -INSTALLATION MEETINGS <br />A. The Contractor shall notify the Engineer and the County in writing about the time <br />and place of such meetings. Such notice shall be two business days prior to <br />installation. <br />1.12 DELIVERY, STORAGE, AND HANDLING <br />A. The Contractor shall submit a delivery schedule for the piping, valves, flare, <br />blower skid and electrical panels - <br />1. 13 <br />anels_ <br />1.13 SCHEDULING <br />A. Before Work is started, the Contractor shall submit to the Engineer for review a <br />schedule of the proposed construction operations. The construction schedule shall <br />indicate the sequence of the Work indicating the time of completion of each <br />component of the Work. Schedule shall show work done on site throughout the <br />Contract working days. <br />North County LFG Collection System 4 SUBMITTALS <br />San Joaquin County Public Works Section 01300 <br />