My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 11:01:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br /> (02/01) <br /> The bidder shall set forth for each unit basis item of work a unit price and a total <br /> for the item, and for each lump sum item a total for the item, all in clearly legible figures <br /> in the respective spaces provided for that purpose. In the case of unit basis items, the <br /> amount set forth under the "Item Total" column shall be the product of the unit price bid <br /> and the estimated quantity for the item. <br /> 2-1.01 D CERTIFICATIONS.-Certifications are required as identified in <br /> the Notice To Contractors. <br /> 2-1.01 E INTERPRETATION OF BIDS.--In the case of discrepancy <br /> between the unit price and the total set forth for a,unit basis item, the unit price shall <br /> prevail, except as provided in (a) or (b), as follows: <br /> (a) If the amount set forth as a unit price is unreadable or otherwise <br /> unclear, or is omitted, or is the same as the amount as the entry in <br /> the item total column, then the amount set forth in the item total <br /> column for the item shall prevail and shall be divided by the <br /> estimated quantity for the item and the price thus obtained shall be <br /> the unit price; <br /> (b) (Decimal Errors) If the product of the entered unit price and the <br /> estimated quantity is exactly off by a factor of ten, one hundred, <br /> etc., or one-tenth, or one-hundredth, etc. from the entered total, <br /> the discrepancy will be resolved by using the entered unit price or <br /> item total, whichever most closely approximates percentagewise <br /> the unit price or item total in the Department's Final Estimate of <br /> cost. <br /> 2-1.02 REQUIRED LISTING OF PROPOSED SUBCONTRACTORS.-- <br /> The second paragraph of Section 2-1.054, "Required Listing of Proposed <br /> Subcontractors," of the Standard Specifications is amended to read: <br /> A sheet for listing the subcontractors, as required herein, is included in the <br /> Proposal. <br /> 2-1.03 LOCAL HIRE.--This project is subject to the County's Local Hire <br /> policy. This County has adopted a goal for local hire participation in the construction <br /> workforce in accordance with Board of Supervisors' policy. <br /> Bidder's attention is directed to the following matters- <br /> 2-1.03A--For purposes of this policy only, the definition of Contractor is <br /> p p P Y <br /> limited to the total workforce of the prime or principal Contractor and all subcontractors <br /> who will work in the County under the construction contract. <br /> 2-2 <br /> (SPECS\1997\C01 NON92-2-2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.