SECTION <br /> SECTION 8. MATERIALS <br /> 8-1.01 GENERAL.--Attention is directed to Section 6, "Control of <br /> Materials," of the Standard Specifications and these special provisions. <br /> 8-1.02 CONTROL OF MATERIAL.--A minimum of one week prior to <br /> hauling materials, the Contractor shall submit in writing, a statement describing the <br /> material sources and the intended haul routes for all contract items. This statement <br /> will not be required for contract items of quantities less than 170 C.Y. or 200 Tons. <br /> The Engineer reserves the right to change haul routes at any time according to <br /> the best interest of the County. If the Engineer changes a haul route, an adjustment will <br /> be made in the contract unit price of the items affected. The adjustment in the contract <br /> unit price of the items affected shall be done by change order prior to any hauling. Any <br /> hauling done without a contract change order, regardless of routes used, shall be done <br /> at the original contract price and no adjustment shall be made. Adjustment will be <br /> based on Public Utilities Commission rates and the price of the item in question will be <br /> increased or decreased in relation to.the change in the length of the one-way haul.to the <br /> job. <br /> Only one way to the job mileage will be considered and no allowance will be <br /> made for the condition of the roadway. if the new route leads through a congested area <br /> within the corporate limits of a city, an adjustment in the unit price of the affected item <br /> may be made on a time basis. <br /> 8-1.03 WEIGHING MATERIALS.—Attention is directed to Section 9, <br /> "Measurement and Payment,"of the Standard Specifications and these special <br /> provisions. <br /> The cost shall be considered as included in other contract items of work, and no <br /> further allowance shall be made therefor. <br /> In no event Will County pay for any portion of a load of material which is in excess <br /> of the legal load limit for the vehicle transporting it. The payment for the weight of all <br /> material in excess of legal load limits will be deducted from the contract pay quantity for <br /> that specific material. <br /> 8-1 <br /> (SPECSWASTERICO-8-1) <br />