Laserfiche WebLink
SECTION 9 <br /> SECTION 9. DESCRIPTION OF WORK <br /> The work at the North County Landfill consists of: <br /> 1) Installation of 12 landfill gas migration monitoring wells <br /> 2) Installation of well enclosures for each well <br /> 3) Installation of bollards at designated wells <br /> 4) Installation of cow barriers at designated wells <br /> 5) Installation of gates at specified locations and other fencing as shown <br /> The work at the Foothill Landfill consists of: <br /> 1) Installation of 24 landfill gas migration monitoring wells <br /> 2) Installation of well enclosures at each well <br /> 3) Installation of bollards at designated wells <br /> 4) Installation of cow barriers at designated wells <br /> 5) Installations of gates at specified locations <br /> Special attention is directed to and Section 13-3.01, 13-3.02 and Section 10-1.01 <br /> "Order of Work" of these specifications. <br /> NA2PerimLFGwe11s o8\Specs\Sect 9 DescriptOfWork.doc <br /> 9-1 <br />