Laserfiche WebLink
SECTION 10 <br /> SPECIAL <br /> 10-1.02 STAKING.--Staking shall conform to the provisions of Section <br /> 5-1.07, "Lines and Grades," of the Standard Specifications and these special <br /> provisions, and to Section 01055 of the Technical Specifications. <br /> A. Control Stakes and Field Adjustments: <br /> ' The County has staked the location of LFG migration monitoring wells, walk gates, and <br /> drive gates at both sites as shown on the construction drawings. The Contractor shall <br /> install LFG monitoring wells, walk gates and drive gates at the staked locations. The <br /> Engineer may adjust the location of LFG monitoring wells due to site conditions. <br /> ' 10-1.03 PROGRESS SCHEDULE.--Attention is directed to <br /> Section 8-1.04, "Progress Schedule," of the Standard Specifications and these special <br /> provisions. The Progress Schedule shall include, at a minimum, the following items: <br /> ' a. Number and description of drill rigs for the project <br /> b. Method of drilling and installation of LFG migration monitoring wells <br /> 10-1.04. Not Used <br /> 10-1.05 FORCE ACCOUNT.--Attention is directed to Sections 4-1.03, <br /> "Changes," and 9-1.03, "Force Account Payment," of the Standard Specifications and <br /> these special provisions. <br /> The contract item "force account" shall be restricted to work required for public <br /> convenience and minor engineering changes. <br /> 10-1.06 MEASUREMENT & PAYMENT.--Attention is directed to <br /> Section 9, "Measurement and Payment," of the Standard Specifications. <br /> (a) Amend Section 9-1.03A (3b), "Equipment not on the Work," of the <br /> Standard Specifications as follows: <br /> Delete paragraph 9-1.03A (3b) (5) and substitute the following: <br /> (5) The rental time to be paid for equipment shall be the time the <br /> equipment is in operation on the extra work. Rental rates paid shall <br /> be those listed in the current publication of the State of California <br /> Department of Transportation, entitled "Labor Surcharge and <br /> Equipment Rental Rates," at the time when extra work is <br /> performed. <br /> 10-5 <br />