My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 11:01:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'w <br /> r; <br /> Sec. 10-1, Construction Details <br /> Std. Spec.Sec 11 <br /> Special <br /> Page 1 of 1 <br /> ' SECTION 11. MOBILIZATION <br /> PART 1 - GENERAL <br /> 1.01 DESCRIPTION <br /> Mobilization shall conform to the requirements in Section 11, "Mobilization,"of the <br /> Standard Specifications and also of the following: <br /> ' 1 Delivering to the landfill site and work areas all necessary equipmert, <br /> uncontaminated tools, materials and supplies in good working order. <br /> ' 2 Providing drill rigs capable of successfully going to the drill locations identified on <br /> the construction drawings at both landfills. <br /> ' 3 Providing clean drilling augers to drill and install at least 6 wells at each site <br /> during a work day. <br /> ' 4 Establishing a work force sufficient to commence and sustain the scope of work. <br /> 5 Providing the driller foreman with a working cell phone. <br /> ' 6 Providing sanitary facilities as needed. <br /> 7 Removing contractor materials, equipment, and debris from the sites at the <br /> completion of the project. <br /> PART 2- MEASUREMENT AND PAYMENT <br /> 2.01 PAYMENT <br /> 5 <br /> The contract lump sum price paid for Mobilization at North County Landfill and for <br /> Mobilization at Foothill Landfill shall include full compensation for furnishing all labor, <br /> materials, tools, equipment and incidentals necessary forMobilization, submittals and <br /> sanitary facilities at each site. <br /> NA2PerimLFGwe11s 08\specs\Sect 11 Mobilization.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.