Laserfiche WebLink
'w <br /> r; <br /> Sec. 10-1, Construction Details <br /> Std. Spec.Sec 11 <br /> Special <br /> Page 1 of 1 <br /> ' SECTION 11. MOBILIZATION <br /> PART 1 - GENERAL <br /> 1.01 DESCRIPTION <br /> Mobilization shall conform to the requirements in Section 11, "Mobilization,"of the <br /> Standard Specifications and also of the following: <br /> ' 1 Delivering to the landfill site and work areas all necessary equipmert, <br /> uncontaminated tools, materials and supplies in good working order. <br /> ' 2 Providing drill rigs capable of successfully going to the drill locations identified on <br /> the construction drawings at both landfills. <br /> ' 3 Providing clean drilling augers to drill and install at least 6 wells at each site <br /> during a work day. <br /> ' 4 Establishing a work force sufficient to commence and sustain the scope of work. <br /> 5 Providing the driller foreman with a working cell phone. <br /> ' 6 Providing sanitary facilities as needed. <br /> 7 Removing contractor materials, equipment, and debris from the sites at the <br /> completion of the project. <br /> PART 2- MEASUREMENT AND PAYMENT <br /> 2.01 PAYMENT <br /> 5 <br /> The contract lump sum price paid for Mobilization at North County Landfill and for <br /> Mobilization at Foothill Landfill shall include full compensation for furnishing all labor, <br /> materials, tools, equipment and incidentals necessary forMobilization, submittals and <br /> sanitary facilities at each site. <br /> NA2PerimLFGwe11s 08\specs\Sect 11 Mobilization.doc <br />