Laserfiche WebLink
Sec. 10-1, Construction Details <br /> Std. Spec.Sec 13 <br /> Special <br /> Page 3 of 9 <br /> E. Blank Identification Tags <br /> 1 Blank identification tags shall be as follows: <br /> a. Deep probe pipe: Yellow/Gold <br /> b. Intermediate probe pipe: Blue <br /> ' C. Shallow probe pipe: Red <br /> Blank identification tags shall be round, made of aluminum and anodized with the <br /> specified colors of the probe depths. <br /> PART 3 - EXECUTION <br /> 3.01 PERMITS <br /> A. Contractor shall secure permits to drill and install soil gas wells from San Joaquin <br /> County Environmental Health Department (EHD), Solid Waste Unit 6. <br /> B. Contractor shall submit to EHD all necessary well permit applications and a <br /> Work/Health and Safety plan to secure well permits. The County will provide each <br /> ' sites APN #, Facility ID #, Land use permit#, and GIS coordinates required in well <br /> permit applications. <br /> C. Contractor shall pay EHD all well permit fees. <br /> D. Contractor shall provide copies of the approved drilling permits from EHD to the <br /> Engineer thirty (30)working days after award of contract. <br /> 3.02 INSPECTION <br /> For the purpose of this inspection, "construction" means placement of any material <br /> in the well bore after drilling. <br /> A. Construction of the wells shall be in the presence of EHD inspectors. <br /> B. Contractor shall pay all EHD's inspection fees. The County will not be liable for <br /> any EHD inspection fees. <br /> C. EHD Inspectors are available for inspection from 9:00 am to 4:00 pm on working <br /> days. The Contractor shall coordinate construction of soil gas wells based on <br /> EHD's available inspection times. The contractor shall schedule inspection(s) of <br /> soil gas well construction with EHD at least 48 hours before starting construction. <br />