My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 11:01:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Sec. 10-1, Construction Details <br /> Std. Spec.Sec 13 <br /> Special <br /> Page 6 of 9 <br /> 3.05 PROBE PIPE ASSEMBLY <br /> A. Probe pipe shall have no joints, kinks or damages. <br /> ' B. Stretch the probe pipe to a near-straight condition prior to cutting the probe pipe to <br /> the specified length. <br /> C. Cut probe pipe longer than the specified dimensions. The intial total probe pipe <br /> length shall be a minimum of 1-foot longer including the total depth and the height <br /> from ground level. <br /> ' D. Cover top end of probe pipe to prevent materials getting in. The cover shall last <br /> through out well installation process. <br /> E. Measure and mark the probe depth on the top end of the probe pipe. <br /> F. Secure PVC cap with No. 6 3/8-inch stainless steel screws. <br /> ' G. Measure and mark the perforated section of the probe pipe. Verify the dimension <br /> of the perforated section of the probe pipe with the Engineer. The perforated <br /> ' section of each probe pipe will be based on the sampling intervals of each well. <br /> H. Drill perforation holes on the probe pipe per the construction drawings. <br /> I. Secure prope pipe weight at the bottom of the probe pipe. Probe pipe weight shall <br /> be securely tied with 16 gauge black annealed tie wire, or equivalent. Tie wire <br /> shall not pass through perforated holes. <br /> ' J Maintain the probe pipe identification throughout the work for accurate labeling. <br /> Accurate probe pipe labeling is of the essence. Identify each probe pipe based on <br /> the depth by painting the top portion of the probe pipe with fast drying oil based <br /> paint a minimum of two (2) hours before inserting the probe pipe into the well bore- <br /> hole as follows: <br /> 1. Deep probe pipe: Yellow/Gold <br /> 2. Intermediate probe pipe: Blue <br /> ' 3. Shallow probe pipe: Red <br /> Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.