Laserfiche WebLink
f` <br /> Sec. 10-1, Construction Details <br /> Std. Spec.Sec 80 <br /> Special <br /> Page 3 of 3 <br /> PART 4 - MEASUREMENT AND PAYMENT <br /> '< 4.01 MEASUREMENT <br /> Measurement for payment for doing fencing work shall be the total work specified at each site <br /> ' on the construction drawings. <br /> 4.02 PAYMENT <br /> ' Payment for fencing work at each site shall be per the lump sum amountq uoted in the bid <br /> proposal. The lump sum amount quoted for fencing work at each site shall include full <br /> compensation for furnishing all labor, materials, tools, equipment, fabricating and installing drive <br /> gates and walk gates, connecting existing fences to the drive and walk gates, removing existing <br /> fences at specified wells, disposing old barbed wire and wood posts at the site, paying all <br /> disposal fees, installing T-Post fences around specified wells, and doing all the work involved in <br /> completing the fencing work as shown on the construction drawings and specified herein. <br /> END OF SECTION <br /> N:12PerimLFGwe11s 081SPecs\Sect 80-S Fencing.doc <br /> t <br />