Laserfiche WebLink
Sec. 10-1, Construction Details <br /> Std. Spec.Sec 80 <br /> Special <br /> ' Page 2 of 3 <br /> C. Post caps shall be schedule 40 galvanized metal post caps. <br /> ' D. Gates shall swingas directed b the Engineer. All walk gates shall open and close <br /> Y 9 9 p <br /> freely without any obstruction. <br /> 2.03 T-POST FENCE <br /> A. Wood Corner Post shall be 4 x 4 pressure treated fence post. Barbed wire shall be <br /> nailed to the wood corner post with galvanized fence staples. <br /> B. T-Posts shall be #133 studded posts with spade either painted with green or red rust <br /> inhabitant paint. <br /> C. Barbed wire shall be per Standard Specifications Section 80-3.01C. <br /> PART 3 - EXECUTION <br /> 3.01 INSTALLATION <br /> ' A. Location of each fencing item will be staked on site by the County. <br /> B. Existing fences shall be connected to the new walk and drive gates. <br /> C. All gate posts shall be installed plumb. <br /> D. Dispose old barbed wire and wood post at the site. Contractor shall pay <br /> all site disposal fees. <br /> E. Stack all old fence T-Posts on site as directed by the Engineer. <br /> ' F. Removal and re-construction of barbed wire fence for drill rig access shall be of the sole <br /> cost of the Contractor. <br /> ' G. Any fencing work not installed to the satisfaction of the Engineer will be required to be <br /> re-installed at no additional cost to the County. <br />