Laserfiche WebLink
1�1 <br />11TENM <br />1 W.Tirila 1 KOMITI 0111057 LUTE I I NO= <br />Location: North County Sanitary Landfill <br />CQA/Engineer: Peter Holland, CEG <br />Prepared by: PH <br />Owner/Client: San Joaquin County Public Works <br />VE�ECTOR <br />ENGINEERING, INC. <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJCPublic Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Monday <br />Report Date: 7120109 Time on Site: 7:00 am <br />7:00 am: Arrived onsite. <br />7:30 am: Drillers onsite (PC Exploration, IR A-400 rig). <br />8:00 am: SJC Public Works onsite. <br />8:00 am: Health and safety meeting. <br />9:00 am: Mobilized to SG -22, <br />10:00 am: PC Exploration began drilling SG -22 with 8 -in hollow stem auger. Vector logged soils. <br />2:30 pm: Drilled SG -22 to final depth of 80 ft bgs. Demobed from SG -22 to SG -21 because Environmental <br />Health can't stay onsite past 3:30pm. <br />3:45 pm: PC Exploration began drilling SG -21. <br />4:30 pm: Finished for day. Completed 10 It of drilling for SG -21. <br />LFG Control completed bringing perforated, cut, and painted pipe and weights to SG -22 and SG - <br />21. Also placed load of gravel on tarps at SG -21 and SG -22. <br />I of I <br />