My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />11 <br />E <br />X-71roialtemiTi MOA <br />Location: North County Sanitary Landfill <br />CQA/Engineer: Peter Holland, CEG <br />Prepared by: PH <br />Owner/Client: San Joaquin County Public Works <br />VE <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Tuesday <br />Report D. 7121109 TimeonSite: 7:15am <br />7:15 am. Arrived onsite. Drillers onsite. <br />7:30 am: <br />Resumed drilling of SG -21, continued from 10 ft depth. <br />7:45 am: <br />Kristin Sample (Vector) here at SG -21. <br />8:00 am: <br />Second PC exploration drill rig arrived. Go to SG -20. <br />9:05 am: <br />Natalia (Env. Health) onsite. <br />11:00 am: Joyesh and Mike (Solid Waste) at SG -21. <br />12:00 pm: Finished drilling SG -21. Wrong probe pipes were delivered to SG -21 from staging area. LFG <br />personnel cut off about 5 ft of perforated section to get the correct length of perforated pipe. <br />12:00-1:00 prn. Began constructing SG -21. <br />1:00 — 3:30 pm: Natalia at SO -21 to observe, Also Alfonso and Mike from Environmental Health onsite. <br />3:30 pm: Completed SG -21 sand the monument and cement/concrete end fittings. Natalia here for <br />construction and had no issues. Monument etc. to be completed later. Used seven 50 -lb bags of <br />bentonite. <br />4:00 pm: Left site. <br />in <br />
The URL can be used to link to this page
Your browser does not support the video tag.