Laserfiche WebLink
11 <br />11 <br />E <br />X-71roialtemiTi MOA <br />Location: North County Sanitary Landfill <br />CQA/Engineer: Peter Holland, CEG <br />Prepared by: PH <br />Owner/Client: San Joaquin County Public Works <br />VE <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Tuesday <br />Report D. 7121109 TimeonSite: 7:15am <br />7:15 am. Arrived onsite. Drillers onsite. <br />7:30 am: <br />Resumed drilling of SG -21, continued from 10 ft depth. <br />7:45 am: <br />Kristin Sample (Vector) here at SG -21. <br />8:00 am: <br />Second PC exploration drill rig arrived. Go to SG -20. <br />9:05 am: <br />Natalia (Env. Health) onsite. <br />11:00 am: Joyesh and Mike (Solid Waste) at SG -21. <br />12:00 pm: Finished drilling SG -21. Wrong probe pipes were delivered to SG -21 from staging area. LFG <br />personnel cut off about 5 ft of perforated section to get the correct length of perforated pipe. <br />12:00-1:00 prn. Began constructing SG -21. <br />1:00 — 3:30 pm: Natalia at SO -21 to observe, Also Alfonso and Mike from Environmental Health onsite. <br />3:30 pm: Completed SG -21 sand the monument and cement/concrete end fittings. Natalia here for <br />construction and had no issues. Monument etc. to be completed later. Used seven 50 -lb bags of <br />bentonite. <br />4:00 pm: Left site. <br />in <br />