My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2�1 <br />wrar-littlKef'"In M., MNUTATall Mimi m1a <br />Location: North County Sanitary Landfill <br />CQA/Engineer Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client: San Joaquin County Public Works <br />VIle" <br />uTOR <br />E,�VEGINEERING, INC. <br />Contractor LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Tuesday <br />Report Date: 7121/09 Time on Site: 7:30 am <br />7:30 am: Arrived onsite. <br />8:00 am: At SG -20 with the second PC Exploration rig (Mobile 561, 8 in O.D. & 4-1/4 in. I.Q. HAS). Driller <br />is Frank. Helper is Kris. <br />8:30 am: Started drilling SG -20. Logged soils. <br />12:00 pm: At 80 ft bgs. Added a couple gallons of water to aid drilling. <br />12:15 pm: Vector is now responsible for measuring perforated length and total length of pipe before <br />installation (per Mike Carroll, Solid Waste). Joyesh (Solid Waste) has provided table of lengths. <br />12:40 pm: Finish drilling SG -20. <br />2:00 pm: Start well construction at SG -20. Env. Health inspectors Mike Kith and Alfonso Arambula at SG - <br />20. Per Mike Kith, is okay to leave well partially completed overnight. Don't need bentonite on <br />top, just need to leave auger in so hole doesn't collapse. <br />3:30 pm: Cut top couple feet off of intermediate probe pipe (had 10 ft above grade, as expected). Since <br />cut off blue end, marked with tape and marker that was intermediate probe, <br />3:40 pm* Stopped well construction at 10 ft depth (top of bentonite). Env. Health inspectors left. <br />4:15 pm: offsite. <br />Loft <br />E <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.