My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location: North County Sanitary Landfill <br />COA/Engineer: Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client San Joaquin County Public Works <br />Contractor LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJG Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week* Friday <br />Report Date* 7/24109 Time on Site: 8.-20 am <br />8:20 am* Onsite. <br />9:15 am: Env. Health inspector Natalia onsite at SG -18. Resumed well construction. Gravel at same level <br />as yesterday (29 ft bgs), <br />9:40 am: Completed SG -18 well construction. Env. Health inspector moved to SG -12 site, <br />9:50 am: Left SG -18 site. <br />10:00 am: At SG -14 site with Tim (Public Works). <br />10:30 -1:45 pm, Drilled SG -14 hole to 65 ft bgs. Logged soils. <br />1:45 pm. Drillers stopped and packed up. <br />2:00 pm, Drillers offsite. Met with Pete (Vector). <br />2:30 pm: Offsite. <br />I of 1 <br />E <br />E <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.