Laserfiche WebLink
Location: North County Sanitary Landfill <br />COA/Engineer: Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client San Joaquin County Public Works <br />Contractor LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJG Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week* Friday <br />Report Date* 7/24109 Time on Site: 8.-20 am <br />8:20 am* Onsite. <br />9:15 am: Env. Health inspector Natalia onsite at SG -18. Resumed well construction. Gravel at same level <br />as yesterday (29 ft bgs), <br />9:40 am: Completed SG -18 well construction. Env. Health inspector moved to SG -12 site, <br />9:50 am: Left SG -18 site. <br />10:00 am: At SG -14 site with Tim (Public Works). <br />10:30 -1:45 pm, Drilled SG -14 hole to 65 ft bgs. Logged soils. <br />1:45 pm. Drillers stopped and packed up. <br />2:00 pm, Drillers offsite. Met with Pete (Vector). <br />2:30 pm: Offsite. <br />I of 1 <br />E <br />E <br />11 <br />