My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 5:58:06 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />E <br />E <br />Mimi mm M., <br />Location: North County Sanitary Landfill <br />CQA/Engineer Pete Holland, CEG <br />Prepared by: PH <br />Owner/Client San Joaquin: County Public Works <br />IAut,TOR <br />RNGINEERING, INC. <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />— ---- --- - <br />* . No: 0346-0203-00 Day of Week: Friday <br />Report Date: 7/24109 Time on Site: 7:00 am <br />7:00 am- Onsite. <br />7:30 am: Continue drilling SG -12 from 45 ft. Drilling continued to be slow from hard soil. <br />9:10 am: Natalia (Env. Health) onsite. She Was with the other PC Exploration rig observing construction of <br />SG -18 for some of the morning. <br />11:45 am: Completed drilling Sg-1 2. Began construction. Natalia was here while the perforation length and <br />total length of the pipe was measured and confirmed. <br />1:20 pm: Completed backfilling/construction of probe depths. Natalia (Env. Health) left. <br />2:00 pm: Mobed to SG -11. <br />3:00 pm, Left site. <br />Also today, contractor placed monuments on SG -22, 21, 20 & 19. Included concrete, dobies, etc. <br />Fence crew also constructed bollards and installed fence near SG -11. At end of day drillers <br />asked me to sign their paperwork for the week. I said that LFG/Mark should be the one to sign. <br />Since Mark wasn't with us at the time we called Mark and he said it was OK for me to sign <br />paperwork. <br />I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.