Laserfiche WebLink
After backfilling the deep probe only rose above grade 2 ft. I measured the piece of perforation <br />that was cut off and it was 2.5 ft, not 1.5 ft like they said they cut. <br />2:30 pm: Kevin (Public Works) arrives and talks to Natalia about spacing of SG -13. <br />3:00 pm: Finish backfilling SGA 1. Natalia leaves. <br />3:00 pm: Joyesh (Solid Waste) arrives, is concerned about probes sticking above ground high enough. <br />3:30 pm: l check on other drilling crew. <br />4:00 pm: Left site. <br />2 oft <br />