Laserfiche WebLink
E <br />11FITuniuming-TouggaMil 0,111PRIN <br />Location: North County Sanitary Landfill <br />CQA/Engineer. Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client: San Joaquin County Public Works <br />" Ar <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Monday <br />Report Date: 7/27/09 Time on Site: 7:30 am <br />7:30 am, Onsite at SG -14 locafion. <br />8:00 am: Resumed drilling SG -14 from 65 ft bg& <br />9:15 am: Finished drilling SG -14 to 87 ft. <br />9:15 am: Env. Health inspector Natalia onsite at SG -14. <br />9:25 am: Pete (Vector) reviewed SG -14 boring logs — OK to proceed. <br />9:45 am: Measured pipe lengths with Natalia — OK to proceed. <br />10:00 am: Began SG -14 well construction. <br />12:15 pm: Finished SG -14 well construction. Env. Health inspector Natalia offsite. Per Natalia — if Mark <br />(LFG) can show that the new SG -13 location does not exceed the 1000 ft max, can start drilling. <br />12:30 pm: Drillers left SG -14 site. <br />12:30-2:00 pm: Difficult to access SG -16 site. Driller support truck got stuck. Truck pulled out. Moved toSG-15 <br />instead. Will need to cut fence by SG -16 to access site due to soft ground. <br />2:10 pm: Set up on SG -15. Location moved 2 ft 3 in to east (per Kevin, Mark) to allow cars to pass after <br />construction. <br />2:15 pm: Start drilling SG -15. <br />3:45 pm: Joyesh (Solid Waste) onsite. Discussed minimum length of pipes above ground. Contractor <br />must have probes at least 3.5 ft above ground surface. Anything less will be unacceptable. <br />4:30 pm: Stopped drilling. Ended at 50 ft. <br />4:45 pm: Offsite. <br />I of I <br />