Laserfiche WebLink
U <br />E <br />-T <br />WriNiflite M-AirerATISIOUT01"Mannim <br />Location: North County Sanitary Landfill/ <br />Foothill Sanitary Landfill <br />CQA/Engineer Kristin Sample, PE <br />Prepared by: KS <br />Owner/Client: San Joaquin County Public Works <br />Contractor: LFG Control Inc. <br />Superintendent: Mark Penn (LFG) <br />Submitted to: SJC Public Works <br />Reviewed By: PH <br />Project No: 03-16-0203-00 Day of Week: Wednesday <br />Report D. 7129109 Time on Site, 7:30 am <br />7:30 am: Onsite. Resumed drilling SG -16 from 55 ft bgs. <br />8:45 am: Finished drilling SG -16 to 80 ft bgs. <br />8:45-9:00 am: Brought soil logs to Pete (Vector) for review. OK to proceed. <br />9:10 am: Env. Health inspector Ben onsite at SG -16. Measured pipes. OK to proceed. <br />9:25 am: Began construction of well SG -16. <br />11:30 am: Finished SG -16 well construction. <br />11:40 am: Env. Health inspector offsite, <br />11:50-12:20 pm: Moved to Foothills Landfill. <br />12:40 pm: Drillers set up on SG -102. <br />2:20 pm: Refusal at 30 ft. Pulled auger. Drill bit destroyed. Gravel and cobbles, <br />3:20 pm: Drillers met with Mark (LFG). Different drill method may be required. Will try other end of site <br />(SG -115, 116) tomorrow where soil supposedly softer. <br />3:40 pm: Driller packed up at SG -102. <br />3:50 pm: Offsite. <br />I oft <br />