My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2009_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:32 PM
Creation date
7/3/2020 11:02:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_1
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2009_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Construction equipment should be equipped with a vertical exhaust at least 5 <br /> feet above grade and/or with spark arrestors. <br /> 9. Electrical motors, if used in the excavation area, shall be explosion-proof or <br /> non-sparking, totally enclosed fan cooled (TEFC); and electrical controls should <br /> be explosion-proof or intrinsically safe and meet the requirements for Class 1, <br /> Division 2, Group D, (Methane), rated equipment in accordance with the <br /> National Electric Code (NEC)_ <br /> 10. No welding should be permitted in, on, or immediately near the excavation <br /> area, unless previously and continuously monitored for methane and other <br /> combustible gases. <br /> 11 . Soil should be stockpiled near the excavation or well for use*in smothering <br /> any combustion, should it occur. <br /> 12. Solvent cleaning, gluing, or bonding of pipe should be performed, to the <br /> extent possible, outside the trench. An organic vapor respirator shall be <br /> worn by persons using PVC solvents or glues. Personnel using solvent and <br /> cement shall be familiar with the appropriate materials safety data sheets <br /> for those products. <br /> 13. Forced ventilation may be required for workers who must work in trenches <br /> deeper than 3 feet. Air blowers and fans may be used for positive <br /> ventilation_ Dilution ventilation may address either an explosive gas hazard <br /> or a hazardous chemical health hazard. The amount of air required for <br /> ventilation must be determined based on the concentrations of explosive <br /> LFG or hazardous chemical constituents, the LEL for methane or the TLVs <br /> for the hazardous chemical constituents in question, the volume to be <br /> protected, ambient conditions, and an appropriate safety factor. These <br /> calculations should be performed by a qualified individual. <br /> 14. During piping assembly, all valves should be closed immediately after in- <br /> stallation. <br /> 15. As construction progresses, all valves should be closed as installed to <br /> prevent the migration of gases through the pipeline and gas collection <br /> system. <br /> 16. All piping shall be capped at the end of each working day. <br /> 1:20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.