My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 11:02:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • Seismic Design <br />The units will be designed to withstand the maximum probable earthquake without <br />damage to the structures that control leachate, storm water, erosion, or landfill gas control <br />facilities. <br />• Maximum Height (Vertical Limits) <br />At completion, the height of the landfill will not exceed 320 ft elevation without written <br />approval by jurisdictional agencies. <br />5.3 CONSTRUCTION SEQUENCING PLANS <br />The North County Landfill is currently planned to be developed in approximately eleven areas. <br />Development of the areas would be in the sequential, counterclockwise numerical order (Plate 6 <br />and Appendix B Figure 3). Detailed design plans for each area will be submitted to the <br />appropriate regulatory agencies for review prior to the construction of each lined area. <br />AUkk <br />qp Because sizing of the areas is dependent on many operational issues, such as anticipated waste <br />stream and capital cost expenditures, the actual size of each area will be adjusted by the County <br />to meet the needs of the County. <br />5.3.1 Excavation and Stockpiling Plans <br />An excavation plan and a stockpile plan will be incorporated into the design of each area. <br />Excavation plans will include the earthwork slopes and base grades, liner limits, LCRS systems, <br />perimeter berms, haul ramps, drainage ditches and storm water basins, and locations of ancillary <br />facilities. The stockpile plans will show the location and grading contours for temporary <br />placement of the surplus soils. <br />The County may seek to lease land adjacent to the landfill property for the placement of an <br />interim stockpile for soil needed for closure. <br />Near the end of landfill development, particularly for Area 11, stockpiling may occur on the top <br />deck of previously constructed areas that have been filled to interim heights. Soil may also be <br />stockpiled north of the refuse fill in non -wetland mitigation areas. <br />North County RC&SL Page 26 of 68 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — October 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.