My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 11:02:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 5.3.2 Base Preparation and Liner Placement Plans <br />The base of each Lined Area will provide drainage to a sump, from which leachate will be <br />removed (Appendix B, Drawing 2). The sump for each Area will be located on the permanent <br />exterior edge of the landfill. This will allow access to the leachate sump via a side slope leachate <br />riser. <br />Each Lined Area will be separately designed and submitted for approval based on the <br />requirements of the state regulations and permits (including WDRs) in effect at the time of <br />submittal. <br />5.3.3 Fill Sequencing Plans <br />Currently, MSW is being placed in Lined Area 4, with future Area 5 area serving as the existing <br />borrow area. The County intends to fill Areas 1 through 4 to near final maximum permitted <br />elevation in accordance with the revised permit height. Area 5 will be constructed in advance of <br />Areas 1-4 reaching its permitted refuse fill capacity. Once Area 5 is approved for disposal by the <br />appropriate regulatory agencies, refuse placement will begin in Area 5 and the Area 6 footprint <br />will become the future borrow area for daily cover. This process will be repeated for the <br />remaining Areas 6 through 11 (See Appendix B, Preliminary Closure/Postclosure Maintenance <br />Plan for fill sequencing). It is presently contemplated that soil will be stockpiled in the eastern <br />mitigation area to provide daily cover for the final Lined Area and closure of any un -closed landfill <br />surfaces (Plate 6). <br />5.4 LEACHATE COLLECTION AND REMOVAL SYSTEM <br />All Lined Areas will have a leachate collection and recovery system (LCRS). Leachate collection <br />systems include collection troughs with lateral and header piping surrounded with drainage <br />gravel. Each lateral leachate pipe will be equipped with a pipe riser for inspection and cleaning if <br />necessary. Leachate will drain along the troughs in the LCRS laterals to a leachate sump. The <br />sumps will include one or more pumps with sensors and automatic controls to maintain a low <br />leachate level. Above -ground leachate storage tanks are and will be used as needed to receive <br />leachate pumped from the sump. All leachate will be returned to the landfill in accordance with <br />the WDRs (Appendix A). <br />North County RC&SL Page 27 of 68 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — October 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.