Laserfiche WebLink
0 7.4.6 Visual Screening and Noise Control <br />Visual screening and noise from the Recycling Center is controlled primarily by the walls of the <br />Recycling Center. Noise is further controlled by the use of mufflers on heavy equipment that may <br />operate within the Recycling Center. <br />7.4.7 Traffic Control and Signage <br />Traffic within the Recycling Center is controlled by posted signs, striping, and by the County <br />Recycling Center attendant who directs customers to unloading areas. <br />7.4.8 Drainage Control in the Recycling Center Area <br />The Recycling center is designed to allow accumulated water to drain to sumps in adjacent areas, <br />from which it is pumped to the drainage ditch west of the Scalehouse. This water then drains <br />through the facility storm drain system to the interim sedimentation pond <br />0 7.4.9 Cleaning and Housekeeping <br />n <br />Cleaning of operational facilities include: <br />• Removing debris that falls around the bins that receive recycled materials or solid waste <br />destined for the active face <br />• Placing recyclable materials in the proper bins <br />• Wrapping universal and electronic waste on their respective pallets <br />Other cleaning and housekeeping activities include: <br />• Clearing the tipping floor at least weekly <br />• Cleaning the roads using a road sweeper approximately bi-weekly. <br />North County RC&St. Page 56 of 68 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — October 10, 2014 <br />