Laserfiche WebLink
TABLE D-1- NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRFCIPITATION IMPACTS <br />9ruary 2014 <br />1of5 <br />Unit <br />Total <br />Item <br />Description <br />Units <br />Price <br />Quantity <br />Cost <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />Components: Equipment transport, permits, construction trailer setup, project management, and <br />administration. <br />Heavy Equipment Transport <br />ea <br />$ 3,000.00 <br />5 <br />$ 15,000.00 <br />Office Trailer <br />Is <br />$ 4,000.00 <br />1 <br />$ 4,000.00 <br />Utilities <br />monthly <br />$ 250.00 <br />0.5 <br />$ 125.00 <br />Bonding <br />% <br />2% <br />1 <br />$ 1,150.00 <br />Project Management and Administration <br />hr <br />$ 175.00 <br />16 <br />$ 2,800.00 <br />Engineering Technician <br />hr <br />$ 100.00 <br />16 <br />$ 1,600.00 <br />Administrative Assistance <br />hr <br />$ 55.00 <br />8 <br />$ 440.00 <br />$ 25,115.00 <br />Subtotal - Mobilization/Demobilization <br />2 <br />SUBGRADE PREPARATION <br />Components: Preparing bench subgrade for reconstruction. Includes excavation of any debris, <br />rough grading, and compaction as necessary to provide a stable surface. <br />Grade Staking Surveying <br />Is <br />$ 4,000.00 <br />1 <br />$ 4,000.00 <br />Backhoe w/ Operator <br />hr <br />$ 103.27 <br />8 <br />$ 826.16 <br />Dozer w/ Operator <br />hr <br />$ 246.51 <br />8 <br />$ 1,972.08 <br />Water Truck w/ Operator <br />hr <br />$ 116.73 <br />8 <br />$ 933.84 <br />Compactor w/ Operator <br />hr <br />$ 209.99 <br />8 <br />$ 1,679.92 <br />Motor Grader w/ Operator <br />hr <br />$ 151.82 <br />8 <br />$ 1,214.56 <br />Grade Checker <br />hr <br />$ 60.64 <br />8 <br />$ 485.12 <br />$ 11,111.68 <br />Subtotal - Subgrade Preparation <br />1of5 <br />