Laserfiche WebLink
® • <br />Oruary 2014 <br />TABLE D-1- NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRECIPITATION IMPACTS <br />Unit <br />Total <br />Item Description <br />Units <br />Price <br />Quantity <br />Cost <br />3 BENCH AND PERIMETER CHANNEL RECONSTRUCTION <br />Components: Surveying and setting grade stakes for the reconstruction of the bench and perimeter <br />channels, excavate and haul —170 cubic yards from borrow/stockpile area, mixing, moisture <br />conditioning, placing, and spreading soil in areas needed to return to design grades. Assumes <br />soil can be obtained from on-site borrow/stockpile area. <br />Grade Staking Surveying <br />Is <br />$ <br />4,000.00 <br />1 <br />$ <br />4,000.00 <br />Scraper w/ Operator <br />hr <br />$ <br />266.78 <br />2 <br />$ <br />533.56 <br />Dozer w/ Operator <br />hr <br />$ <br />246.51 <br />16 <br />$ <br />3,944.16 <br />Water Truck w/ Operator <br />hr <br />$ <br />116.73 <br />16 <br />$ <br />1,867.68 <br />Steel Drum Roller w/ Operator <br />hr <br />$ <br />124.73 <br />16 <br />$ <br />1,995.68 <br />Motor Grader w/ Operator <br />hr <br />$ <br />151.82 <br />16 <br />$ <br />2,429.12 <br />Grade Checker <br />hr <br />$ <br />60.64 <br />16 <br />$ <br />970.24 <br />Field CQA (20% of Construction Costs) <br />hr <br />20% <br />1 <br />$ <br />3,148.09 <br />Subtotal - Bench and Top -Deck Berm Channel Reconstruction <br />$ <br />18,888.53 <br />4 EROSION CONTROL <br />Components: Hydroseeding of surface with native plant species. <br />Seeding of Final Surface with Native Plant Species <br />acre <br />$ <br />2,500.00 <br />0.5 <br />$ <br />1,250.00 <br />Foreman <br />hr <br />$ <br />82.50 <br />8 <br />$ <br />660.00 <br />Laborersi <br />hr <br />$ <br />44.33 <br />16 <br />1 $ <br />709.28 <br />Subtotal - Erosion Control <br />$ <br />2,619.28 <br />2of5 <br />