Laserfiche WebLink
9 9 eruary 2014 <br />TABLE D-1- NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRECIPITATION IMPACTS <br />Total <br />Item Description Cost <br />1 MOBILIZATION/DEMOBILIZATION $ 25,115.00 <br />2 SUBGRADE PREPARATION $ 11,111.68 <br />3 BENCH AND PERIMETER CHANNEL RECONSTRUCTION $ 18,888.53 <br />4 EROSION CONTROL $ 2,619.28 <br />5 CONTRACTOR PER DIEM (INCLUDES TRAVEL)l $ 3,600.00 <br />6 CONTRACTOR PROFIT AND OVERHEAD (15%)2 $ 8,660.17 <br />SUBTOTAL $ 69,994.66 <br />CONTINGENCY @20% $ 13,998.93 <br />TOTAL NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE $ 83,993.59 <br />Notes: <br />1 Per diem of $150 per 8 hour shift. <br />2 Based on 15% of total Contractor construction work costs. <br />4of5 <br />