Laserfiche WebLink
ruary 2014 <br />TABLE D-1- NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />PRFCIPITATICIN IMPACTS <br />5of5 <br />Rates, /Hr <br />Consulting Engineer's Rates <br />Principal <br />225.00 <br />Project Manager/Senior Engineer <br />175.00 <br />Design/Project Engineer <br />120.00 <br />CCW Engineer <br />130.00 <br />CQA Monitor <br />90.00 <br />Geologist/Hydrogeologist <br />110.00 <br />Field Technician <br />100.00 <br />AutoCAD Technician <br />80.00 <br />Clerical <br />55.00 <br />La or and Equipment Rates Used for Construction <br />Rates, $/Hr <br />Equipment <br />Labor <br />Total <br />Laborer <br />- <br />44.33 <br />44.33 <br />Grade Checker <br />- <br />60.64 <br />60.64 <br />- <br />82.50 <br />82.50 <br />Foreman <br />D8 Dozer <br />184.54 <br />61.97 <br />246.51 <br />D4 Dozer <br />49.12 <br />60.64 <br />109.76 <br />Scraper <br />204.81 <br />61.97 <br />266.78 <br />Wheel Loader <br />77.88 <br />61.97 <br />139.85 <br />Padfoot Compactor <br />148.02 <br />61.97 <br />209.99 <br />Motor Grader <br />89.85 <br />61.97 <br />151.82 <br />Backhoe <br />42.63 <br />60.64 <br />103.27 <br />Water Truck <br />66.43 <br />50.30 <br />116.73 <br />Steel Drum Roller <br />62.76 <br />61.97 <br />124.73 <br />Auger (Driller) <br />149.00 <br />59.43 <br />208.43 <br />5 Axle Belly Dump Truck <br />83.50 <br />50.65 <br />134.15 <br />Note: <br />1 Labor: General Prevailing Wages Determination by the Director of Industrial Relations, State of California, August 22, 2012, San Joaquin County. <br />Equipment: State of California Department of Transportation (Caltrans) Labor Surcharge and Equipment Rental Rates, Effective April 1, 2012 to <br />March 31, 2013. <br />5of5 <br />