Laserfiche WebLink
• <br />Oruary 2014 <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Unit <br />Total <br />Item Description Units <br />Price <br />Quantity <br />Cost <br />1 MOBILIZATION/DEMOBILIZATION <br />Components: Equipment transport, permits, construction trailer setup, project management, and <br />administration. <br />Heavy Equipment Transport <br />ea <br />$ <br />3,000.00 <br />4 <br />$ <br />12,000.00 <br />Office Trailer <br />Is <br />$ <br />4,000.00 <br />1 <br />$ <br />4,000.00 <br />Drill Rig <br />ea <br />$ <br />5,000.00 <br />1 <br />$ <br />5,000.00 <br />Bonding <br />% <br />2% <br />1 <br />$ <br />1,430.00 <br />Project Management and Administration <br />hr <br />$ <br />175.00 <br />24 <br />$ <br />4,200.00 <br />Engineering Technician <br />hr <br />$ <br />100.00 <br />24 <br />$ <br />2,400.00 <br />Administrative Assistance <br />hr <br />$ <br />55.00 <br />16 <br />$ <br />880.00 <br />Subtotal - Mobilization/Demobilization <br />$ <br />29,910.00 <br />2 EXCAVATION <br />Components: Excavation and temporary stockpile of waste. <br />Assumes excavation area of 50 -feet diameter and 10 -feet deep. <br />Dozer w/ Operator <br />hr <br />$ <br />246.51 <br />8 <br />$ <br />1,972.08 <br />Scraper w/ Operator <br />hr <br />$ <br />266.78 <br />8 <br />$ <br />2,134.24 <br />Water Truck w/ Operator <br />hr <br />1 $ <br />116.73 <br />8 <br />$ <br />933.84 <br />Subtotal - Excavation <br />1 <br />1 $ <br />5,040.16 <br />1of6 <br />