My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:40:13 AM
Creation date
7/3/2020 11:03:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Description <br />FIRE SUPPRESSION <br />Components: Excavation, hauling and placement of —730 cubic yards of soil for fire suppression. <br />Assumes an area of 50 -feet diameter at 2 -foot thick. Assumes soil will obtained from onsite <br />borrow area/stockpile. <br />r • <br />Scraper w/ Operator <br />Dozer w/ Operator <br />Water Truck w/ Operator <br />Padfoot Compactor w/ Operator <br />Motor Grader w/ Operator <br />Grade Checker <br />Subtotal - Fire Suppression <br />Components: Haul and placement of removed waste. Surveying and setting grade stakes for the <br />final cover, excavate and haul 1,460 cubic yards from borrow/stockpile area, mixing, placing, <br />spreading, moisture condition, and track -walking 4 -foot thick final cover (2 foot foundation layer, <br />1 foot low permeability layer, and 1 foot vegetative soil layer). Assumes soil will be obtained from <br />onsite borrow area/stockpile. <br />Grade Staking Surveying <br />Scraper w/ Operator <br />Dozer w/ Operator <br />Water Truck w/ Operator <br />Padfoot Compactor w/ Operator <br />Motor Grader w/ Operator <br />Grade Checker <br />Field CCW (20% of Construction Costs) <br />Subtotal - Replace Waste and Final Cover <br />2of6 <br />0 ruary 2014 <br />Unit <br />Total <br />Units <br />Price <br />Quantity <br />Cost <br />hr <br />$ <br />266.78 <br />4 <br />$ <br />1,067.12 <br />hr <br />$ <br />246.51 <br />4 <br />$ <br />986.04 <br />hr <br />$ <br />116.73 <br />4 <br />$ <br />466.92 <br />hr <br />$ <br />209.99 <br />4 <br />$ <br />839.96 <br />hr <br />$ <br />151.82 <br />4 <br />$ <br />607.28 <br />hr <br />$ <br />60.64 <br />4 <br />$ <br />242.56 <br />$ <br />4,209.88 <br />Is <br />$ <br />4,000.00 <br />1 <br />$ <br />4,000.00 <br />hr <br />$ <br />266.78 <br />8 <br />$ <br />2,134.24 <br />hr <br />$ <br />246.51 <br />8 <br />$ <br />1,972.08 <br />hr <br />$ <br />116.73 <br />8 <br />$ <br />933.84 <br />hr <br />$ <br />209.99 <br />8 <br />$ <br />1,679.92 <br />hr <br />$ <br />151.82 <br />8 <br />$ <br />1,214.56 <br />hr <br />$ <br />60.64 <br />8 <br />$ <br />485.12 <br />hr <br />20%1 <br />1 <br />$ <br />2,483.95 <br />$ <br />12,419.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.