My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:40:13 AM
Creation date
7/3/2020 11:03:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5of6 <br />0 <br />Oruary 2014 <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - <br />SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Total <br />Item <br />Description <br />Cost <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />$ <br />29,910.00 <br />2 <br />EXCAVATION <br />$ <br />5,040.16 <br />3 <br />FIRE SUPPRESSION <br />$ <br />4,209.88 <br />4 <br />REPLACE WASTE AND FINAL COVER <br />$ <br />12,419.76 <br />5 <br />LANDFILL GAS CONTROL <br />$ <br />18,000.00 <br />6 <br />EROSION CONTROL <br />$ <br />1,869.28 <br />7 <br />CONTRACTOR PER DIEM (INCLUDES TRAVEL)' <br />$ <br />3,300.00 <br />8 <br />CONTRACTOR PROFIT AND OVERHEAD (15%)2 <br />$ <br />10,717.36 <br />9 <br />LANDFILL GAS EXTRACTION WELL INSTALLATION REPORT <br />$ <br />9,420.00 <br />SUBTOTAL <br />$ <br />94,886.44 <br />CONTINGENCY 20% <br />$ <br />18,977.29 <br />TOTAL NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />$ <br />113,863.73 <br />Notes: <br />1 Per diem of $150 per 8 hour shift. <br />2 Based on 15% of total Contractor construction work costs. <br />5of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.