Laserfiche WebLink
5of6 <br />0 <br />Oruary 2014 <br />TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - <br />SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Total <br />Item <br />Description <br />Cost <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />$ <br />29,910.00 <br />2 <br />EXCAVATION <br />$ <br />5,040.16 <br />3 <br />FIRE SUPPRESSION <br />$ <br />4,209.88 <br />4 <br />REPLACE WASTE AND FINAL COVER <br />$ <br />12,419.76 <br />5 <br />LANDFILL GAS CONTROL <br />$ <br />18,000.00 <br />6 <br />EROSION CONTROL <br />$ <br />1,869.28 <br />7 <br />CONTRACTOR PER DIEM (INCLUDES TRAVEL)' <br />$ <br />3,300.00 <br />8 <br />CONTRACTOR PROFIT AND OVERHEAD (15%)2 <br />$ <br />10,717.36 <br />9 <br />LANDFILL GAS EXTRACTION WELL INSTALLATION REPORT <br />$ <br />9,420.00 <br />SUBTOTAL <br />$ <br />94,886.44 <br />CONTINGENCY 20% <br />$ <br />18,977.29 <br />TOTAL NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />$ <br />113,863.73 <br />Notes: <br />1 Per diem of $150 per 8 hour shift. <br />2 Based on 15% of total Contractor construction work costs. <br />5of6 <br />