Laserfiche WebLink
TABLE D-2 - NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL - SAN JOAQUIN COUNTY <br />NON -WATER RELEASE CORRECTIVE ACTION COST ESTIMATE <br />SUBSURFACE FIRE IMPACTS <br />Description <br />CONTRACTOR PER DIEM (INCLUDES TRAVEL) <br />Total Contractor Hours <br />Components: Total contractor hours, divided by 8 hr shifts. <br />Contractor Shifts <br />Subtotal - Contractor Per Diem <br />CONTRACTOR PROFIT AND OVERHEAD (15%) <br />Total Contractor costs <br />Components: 15% of total contract cost. <br />Contractor Cosi <br />Subtotal - Contractor Profit and Overheac <br />LANDFILL GAS EXTRACTION ELL INSTALLATION REPORT <br />Components: Preparation of landfill gas extraction well installation report by a California <br />registered/licensed geologist and responding to agency comments. <br />Project Manager/Senior Engineei <br />Geologist/Hydrogeologisi <br />AutoCAE <br />Clerica <br />Miscellaneous Expense: <br />Subtotal - Landfill Gas Extraction Well Installation Repor <br />4 of 6 <br />*ruary 2014 <br />Unit <br />Total <br />Units <br />Price <br />Quantity <br />Cost <br />man days <br />$ <br />150.00 <br />22 <br />$ <br />3,300.00 <br />$ <br />3,300.00 <br />$ <br />15`ya <br />$71,449 <br />$ <br />10,717.36 <br />$ <br />10,717.36 <br />hr <br />$ <br />175.00 <br />16 <br />$ <br />2,800.00 <br />hr <br />$ <br />110.00 <br />40 <br />$ <br />4,400.00 <br />hr <br />$ <br />80.00 <br />16 <br />$ <br />1,280.00 <br />hr <br />$ <br />55.00 <br />8 <br />$ <br />440.00 <br />Is <br />$ <br />500.00 <br />1 <br />$ <br />500.00 <br />$ <br />9,420.00 <br />