My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1988_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1988_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:52:44 PM
Creation date
7/3/2020 11:04:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1988_2
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1988_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 QUALITY ASSURANCE/QUALITY CONTROL <br /> A quality assurance/quality control (QA/QC) program was implemented <br /> during the Corral Hollow Sanitary Landfill ASWAT testing to produce <br /> accurate, precise, and complete data. The QA/QC program is divided <br /> into two major parts: field quality control and laboratory quality <br /> control . <br /> 5.1 FIELD QUALITY CONTROL <br /> 5. 1.1 Equipment Calibration <br /> Before field sampling, the following equipment checks and calibrations <br /> were performed: <br /> • Leak check - The ambient air samplers and the well sam- <br /> pling pump were inspected for loose fittings and leaks. <br /> A positive pressure leak check was performed with a soap <br /> solution. <br /> • Pump flow calibration - The inline rotometers were veri - <br /> fied against a reference bubble flow meter just before <br /> the sampling event. <br /> • Meteorological station calibration - The meteorological <br /> station was set up and operations checked. If the wind <br /> vane direction data output did not correspond to the wind <br /> vane's direction, an electronic calibration was performed <br /> for both wind direction and wind speed. <br /> • OVA calibration - The OVA is factory-calibrated and <br /> should not require calibration unless the analyzer is <br /> repaired. However, a complete check of the system and <br /> verification of the calibration was performed before the <br /> sampling event. To check calibration of the OVA, ultra- <br /> pure air is used to zero the analyzer and 100 ppm methane <br /> gas standard is used to calibrate the span of the ana- <br /> lyzer. <br /> GasTech meter calibration - In the office or field the <br /> GasTech meter was leak checked, the oxygen detector Cali- <br /> brated, the percent gas detector calibrated against a <br /> 47.4 percent methane gas standard, and the percent lower <br /> explosive limit (LEL) detector calibrated against a <br /> 2.5 percent methane gas (50 percent LEL) standard. <br /> PJ9 9390304.00D 5-1 Rev. 0 09/20/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.