Laserfiche WebLink
I <br />ENGINEERING REPORT REQUIREMENTS <br />Information Necessary for Review of Facility Permits <br />Operating permits for disposal sites that were operating prior to <br />enactment of the Z'berg-Kapiloff Solid Waste Control Act of 1976 <br />were processed during 1977 and 1978 under the "Grandfather" <br />provisions of the code. Engineering information addressing geo <br />logy, hydrology, drainage, leachate control, site design and <br />operation and waste cell construction was frequently not provided <br />by the applicant as part of the permit application since a pro- <br />fessionally designed site was not a prerequisite for a grand- <br />fathered permit. To ensure that the land, water, and air re- <br />sources of the state were protected a provision for periodic site <br />review, section 17751, 14 CAC was included in the code. <br />This section states that, "From the date of issuance of the <br />permit, at least once each five years, or more frequently as <br />determinined by the enforcement agency, the owner or operator <br />shall cause a registered civil engineer to review the site de- <br />sign, implementation and operation plan to determine if any <br />revisions are necessary and to estimate the remaining site life. <br />The conclusions and recommendations of his review shall be pre- <br />sented in a report and filed with the enforcement agency and the <br />Board." <br />1 <br />