Laserfiche WebLink
In addition, provide the following: <br />a) Hours Of Site operation. <br />b) Plans for Waste handling and separation. <br />C) Plans for standby equipment availability. <br />d) Description Of equipment used for handling and disposal <br />e) Description <br />Of Sanitary facilities for <br />employees, <br />Including Potable water supply. <br />f) Climatic conditions at the Site. Information should <br />include average annual rain and snowfall, length of <br />rain <br />and snow seasons, and a chart or wind rose showing mean <br />annual wind velocity and direction. <br />9) If climatic conditions Such as frost, snow, or wet <br />weather are likely to adversely affect Site access <br />or <br />surface Soils handling, Measures.to overcome theses <br />conditions are to be Outlined. <br />Control measures, If necessary, for each of the following: <br />noise, odors, litter, dust, Insects, rodents, and fire. <br />If salvaging is to be permitted, list conditions to be <br />Imposed on Salvagers. The number and types Of salvage <br />vehicles are to be given, as well at the frequency of <br />removal Of salvaged materials. <br />A statement as to whether noise from site operations 1. <br />likely <br />to create health hazards to persons Using the <br />site <br />and/or to nearby residents. Indicate whether <br />nearby <br />residents have complained about noise from <br />Site <br />