My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1988_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1988_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:52:56 PM
Creation date
7/3/2020 11:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1988_4
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1988_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII LANDFILL OPERATION <br /> A. Site preparation needed before beginning next phase of <br /> disposal operation: <br /> The next phase of operation will be to complete filing of the <br /> last remaining pit, which is identified as Module 1 of the <br /> Closure Plan. This is the area currently being used, which <br /> therefore will not require preparation. However, soils will <br /> have to be imported and stockpiled for use in operations. The <br /> stockpile area is in the northeastern portion of the landfill as <br /> indicated on Drawing 1 of the Closure Plan. This stockpile will <br /> be replenished as needed. <br /> B. Landfilling procedures and sequence of waste cell building: <br /> General information on landfillingprocedures p r and phasing is <br /> contained in the Operations Plan and Closure Plan for the site. <br /> C. Control of waste: <br /> Information on control of waste at the landfill is contained in <br /> Sections 2.2 of the Operations Plan for the site. Control of <br /> incoming waste will also include a hazardous waste exclusion <br /> program that is in the process of being submitted to the RWQCB <br /> for approval before implementation. <br /> D. Control of construction work: <br /> Information on control of construction for the site is contained <br /> in Section 2.4 of the Operations Plan for the site. <br /> E. Control of nuisance and health hazards: <br /> Information on control of nuisance and health hazards is <br /> contained in Section 2.5 of the Operations Plan for the site. In <br /> addition to mitigation measures for the typical landfill <br /> operations nuisances discussed in Section 2.5, a hazardous waste <br /> exclusion program is currently being submitted to the RWQCB and <br /> will be implemented at the site upon approval. <br /> F. Site inspection and maintenance: <br /> Details on inspection and maintenance are contained in Section <br /> 3 . 0 of the Operations Plan for the site. <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.