Laserfiche WebLink
CLOSURE AND POSTCLOSURE MAINTENANCE PLAN <br />CLOSURE SCHEDULE <br />Closure activities will occur during the operational and closure <br />phases of the landfill. Final cover will be placed as each module is <br />developed to final grade. The estimated schedule for closure of each <br />module is shown in the following table. <br />Table 2 <br />MODULE CLOSURE SCHEDULE <br />CORRAL HOLLOW SANITARY LANDFILL <br />The projected date for completion of landfilling operations is January <br />1993. Final closure activities will be complete by September 1993. <br />FINAL TREATMENT PROCEDURES <br />The site is operated as a sanitary landfill in which refuse is dis- <br />posed using the trench method. As such, the refuse will remain in- <br />place through the closure and postclosure periods. <br />PJ9 9390310.00D 4 <br />Final <br />Date to <br />Reach <br />Cover <br />Schedule <br />for <br />Module <br />Final <br />Grade <br />Acreage <br />Final <br />Cover Placement <br />Faces at Final Grade <br />------- <br />1988 <br />11.3 <br />June <br />to <br />September <br />1991 <br />1 <br />January <br />1991 <br />2.0 <br />June <br />to <br />September <br />1991 <br />2 <br />July <br />1991 <br />9.4 <br />June <br />to <br />September <br />1991 <br />3 <br />June <br />1992 <br />8.0 <br />June <br />to <br />September <br />1992 <br />4 <br />January <br />1993 <br />8.5 <br />June <br />to <br />September <br />1993 <br />The projected date for completion of landfilling operations is January <br />1993. Final closure activities will be complete by September 1993. <br />FINAL TREATMENT PROCEDURES <br />The site is operated as a sanitary landfill in which refuse is dis- <br />posed using the trench method. As such, the refuse will remain in- <br />place through the closure and postclosure periods. <br />PJ9 9390310.00D 4 <br />