My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tons per day. This will require each trailer to make up to three trips per day. Total travel and <br /> unloading time to either of the landfills for disposal is estimated at two hours. Additional <br /> trailers and tractor units will be provided as needed. All trailers will be covered with hinged <br /> screens or other appropriate covers at all times during transport. <br /> b. Equipment Maintenance <br /> The wear and tear of machinery and equipment is high due to the non-uniformity and <br /> characteristics of municipal solid waste. Thus all equipment will be inspected and maintained <br /> in accordance with manufacturer recommendations and OSHA requirements. Operators and <br /> supervisors will monitor the operation of equipment they are using and if any problems are <br /> identified or suspected the equipment will be identified to the maintenance shop manager. A <br /> maintenance program will be established prior to the start of operation. The program will be <br /> based on the actual equipment and on equipment supplier recommendations. This program will <br /> include, but is no limited to the following: <br /> • Training all mechanics and maintenance personnel in the maintenance of the type of <br /> equipment to be utilized at the station. <br /> • Lubrication schedule for all equipment. <br /> • Equipment service program based on hours of operation. <br /> • Daily operations clean-up procedures for conveying equipment. <br /> • Establish a program for equipment and machinery replacement based on hours of <br /> operation and service. <br /> C. Standby Equipment <br /> Equipment breakdowns will be minimal due to preventative maintenance measures. Mechanics <br /> are available daily to make repairs to material handling equipment, structures or facilities. <br /> Standby equipment to assure ongoing operations will be obtained, if necessary, from: <br /> L:/PROJECr/397/MRF/RSI-I.TCY <br /> Revision 1.0 31 December 15, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.