Laserfiche WebLink
Ile more specialized equipment such as tub grinders, windrow turners and screens will be <br /> brought in, if necessary, on a temporary basis from the following two similar facilities: <br /> California Waste Management Systems Pleasanton Gabarge Service <br /> 1333 E. Turner Road 3110 Busch Road <br /> Lodi, CA 95241 Pleasanton, CA 94566 <br /> (209) 369-8274 (510) 846-2041 <br /> 4. HOUSEKEEPING <br /> The equipment maintenance function will be centralized at the office and space located at the <br /> southern boundary of the MRF/Transfer Station as shown on the Preliminary Site Plan. No fuel <br /> drums, spare parts, inoperable equipment and tires will be stored at the composting site. Storage <br /> space will be available at the maintenance site or near the MRF/Transfer Station. <br /> D. MATERIALS HANDLING ACTIVITIES <br /> Signage at the site entrance will explain facility policies as to acceptable materials, unacceptable <br /> contaminants and hazardous wastes. All incoming loads will be screened and weighed at the <br /> 0 gatehouse. The gatehouse attendant will direct vehicles with acceptable materials to the <br /> Receiving and Unloading Area of the compost site as shown in Figure 7. Unacceptable loads <br /> will be rejected. <br /> 1. CONFINED UNLOADING <br /> The Unloading Area will be divided into clearly defined sections based on the size of the vehicle <br /> and the type of waste material. For safety reasons, compaction and other large commercial <br /> vehicles will be kept separate from small self-haul vehicles. A facility employee will direct <br /> unloading procedures and inspect materials for various contaminants such as plastics, metals, <br /> glass, paper, concrete, paint and treated lumber. Contaminants will be removed and placed in <br /> containers for weekly disposal. <br /> All litter will be contained within the MRF/Transfer and Composting Facility site boundaries. <br /> Litter will be controlled by fences in strategic locations within the facility and around the entire <br /> perimeters of the site. An aggressive program of litter control will include the daily pick up of <br /> litter. <br /> Materials will be stacked with a front-end loader in a first-in, first-out inventory system. This <br /> L/PROJECT/397/M"/RC14.TCY FcbniM 1, 19% <br /> 24 <br />