Laserfiche WebLink
Construction Quality Assurance (CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> penetrated the torn GCL. All repairs will be made at no additional cost to the Owner. <br /> The patch will not be nailed or stapled. <br /> The CQA Monitor will observe any repair, note any non-compliance with the above <br /> requirements, and report them to the CQA Manager. <br /> 4.2.7 Materials in Contact with GCL <br /> Equipment used for placing vegetative soil material will not be driven directly on the <br /> GCL. <br /> Installation of the GCL in appurtenant areas, and connection of the GCL to <br /> appurtenances will be made according to the drawings. The Installer and Contractor <br /> will ensure that the GCL is not damaged while working around appurtenances. <br /> Vector Engineering, Inc. •143E Spring Hill Drive *Grass Valley, CA• (530) 272-2448 <br /> -25- <br />