My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:13:45 AM
Creation date
7/3/2020 11:05:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_2
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t2. Resurvey of reworked grid areas as necessary. <br /> E. Record Survey Drawing Preparation <br /> 1. Prepare record drawings for each layer surveyed with grid point number <br /> design elevation and record elevation for each point-on-point grid coordinate <br /> location. Sheets subsequent to the prepared subgrade shall contain in tabular <br /> ' format the prepared subgrade record elevation (or other layer record <br /> elevation), then final cover and earthfill designs and record elevations and <br /> actual thicknesses. The LFG pipe trenches and GCL limit surveys shall be on <br /> a separate drawing sheet. Drawing sheets to be considered are as follows: <br /> a. Top of Prepared Subgrade grid <br /> b. LFG gas trenches <br /> c. GCL Limit <br /> d. Ditch alignment and grades <br /> Some record drawings may be combined with prior authorization from Engineer. <br /> Drawings shall be 1"=50' scale and shall be in AutoCAD version 14 format. <br /> Drawings are to be produced in electronic format, on CD disk with hard prints on <br /> bond. The hard copy set shall be sealed by the Surveyor. <br /> 2. A letter certifying that the earthwork layers are within specified grading <br /> tolerances and meet or exceed specified thickness shall be prepared, sealed <br /> by the Surveyor, and accompany the record survey drawing submittal. <br /> I The Record Survey Drawing preparation and submittal may be prepared for <br /> each layer and submitted with or following the submittal of the verification <br /> survey data in Article 1.04 B.S. The Engineer shall have 10 working days for <br /> review. <br /> ' 4. AutoCAD drawings shall be on the same basis as the Construction Drawings. <br /> F. Other Facilities <br /> 1. Stake locations for other facilities as necessary for determining correct <br /> locations and elevations for construction, and provide verification survey data <br /> when indicated by the specifications for the item of work. <br /> ' SNAW ENV/RONMENTAL,INC. <br /> San Joaquin County—Extension of Cap Corral HolloNN Sanitary Landfill—Final CH TS.Doc Rev.0,09/28/2011 <br /> Layout of Work and Surveys <br /> 01052-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.