My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:13:45 AM
Creation date
7/3/2020 11:05:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_2
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. To establish top of subgrade grading, provide "point-on point" coordinates <br /> and finish grade elevations on a 50-foot grid and more frequent in irregular <br /> areas and along slope grades. <br /> 3. Establish stake-out coordinates for the location of each subgrade location for <br /> the point-on-point established grid. Subsequent surveys for the verification <br /> of the prepared subgrade and subsequent vegetation soil and earthfill layer <br /> surface elevations and thickness shall be located at the same point-on-point <br /> grid locations, and along LFG pipe trenches and edges of prepared subgrade <br /> for GCL placement, and drainage and operations layers where placed, as <br /> outlined in Article 1.04 E.1. <br /> 4. Provide one set of offset stakes for the drainage ditches at 25-foot intervals. <br /> 5. Provide verification surveys on the established point-on-point grid; provide <br /> verification surveys for LFG pipe trenches and for drainage take off at <br /> flowlines at 25-foot on center and angle points for future reference and record <br /> drawings. Verification surveys shall also be provided along the edge of GCL <br /> placement. <br /> 6. The verification survey data for layer surface elevations and the final GCL <br /> cover, earthfill, vegetative soil layer, and aggregate base thicknesses shall be <br /> compiled in tabular format to verify each layer point-on-point grid location <br /> surface is within grade tolerance and meets minimum thickness requirements, <br /> and shall be submitted to the Engineer for review prior to the placement of <br /> the next component. The Engineer shall have up to 2 working days to review <br /> the survey data. The Engineer's review does not relieve the Contractor of the <br /> responsibility for achieving the specified grades within allowed tolerances <br /> and the minimum layer thicknesses. <br /> C_ Anchor Trench/ Liner Limit Survey <br /> 1. Stake location of GCL limit per plan details at 5046ot on center and angle <br /> points. <br /> 2. Provide verification survey for GCL limit location. <br /> 3. Survey and calculate the total area on which geosynthetic material was or <br /> will be placed., <br /> D. Final Soil Layer and Earthfill Soil Layers Survey <br /> 1. Upon completion of drainage layer, and sub the earthfill layer, check layer <br /> ' thicknesses and mark differences on Engineer approved survey markers. <br /> SHAW ENV/RONMENTAL, INC. <br /> San Joaquin County—Extension of Cap Corral Hollow Sanitary Landfill—Final_CH_TS.Doc Rev. 0,09/28/2011 <br /> Layout of Work and Surveys <br /> 01052-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.