Laserfiche WebLink
SECTION 01300 <br />PART 1- GENERAL <br />1.01 SUMMARY <br />A. This section supplements the requirements specified in the Specifications. If the <br />requirements of this section and conditions noted above conflict, the Contractor <br />shall adhere to the more stringent requirement as determined by the Engineer. <br />1. Submittal for Review: <br />a. Submit technical submittals for the Engineer's review in accordance with <br />requirements of and as identified in the applicable Technical <br />Specification and this Section. <br />2. Submittal for Record: <br />a. Submit required technical submittals for inclusion into the Engineer's <br />records. <br />B. Section includes general requirements for the preparation and submission of the <br />following submittals required for the completion of the Work of the Contract: <br />1. Technical Submittals for Review or Record: <br />a. Schedule of Technical Submittals <br />b. Shop Drawings <br />c. Samples <br />d. Product Data <br />e. Manufacturers' Instructions <br />f. Design Calculations and Design Drawings <br />g. Certificates of Compliance <br />2. Submittals for Review or Record: <br />a. Schedule of General Submittals <br />SHAW ENVIRONMENTAL, /NC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />01300-1 <br />