My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />C <br />ILI <br />n <br />0 <br />b. Schedules and Reports <br />D. Failure to comply with the submittal requirements is grounds for rejection of the <br />submittal without review of the submittal contents. <br />E. All submittals shall be in the English language. <br />F. The Contractor shall submit all submittals to the Engineer under a completed copy <br />of a standardized submittal form provided by the Engineer. <br />G. Engineer Review Time: <br />1. The Engineer will review submittals without deliberate delay. <br />2. Review time starts when the submittal is received by the Engineer and ends <br />when the reviewed submittal leaves the Engineer's office for delivery to the <br />Contractor. <br />3. The Contractor shall allow 10 working days for submittal review unless <br />otherwise allowed in the applicable Specifications or agreed to by the <br />Engineer. <br />H. Additional contract time will not be granted for re -review of submittals. <br />I. Technical and General Submittals shall be numerically serialized by type, Technical <br />Submittal with a "T" prefix (T-1, T-2, T-3, etc.), General Submittal with an "R" <br />prefix. <br />I The Contractor shall submit the number of copies of each submittal that the <br />Contractor requires to be returned, plus two (2) copies that will be retained by the <br />Engineer. <br />K. Each submittal shall be forwarded under a transmittal letter which shall include <br />reference to the specific project site(s) and identify the specific submittal. <br />L. Engineer Review Comments: <br />1. The Engineer's action on submittals will result in the making of one of the <br />following notations with related meanings, or equivalent: <br />a. Accepted Without Exceptions — The work involved may proceed, and no <br />further submission is required. <br />b. Accepted Subject to Comments — The work involved may proceed <br />providing submittal is corrected and resubmitted for record. Approval <br />does not authorize changes to Contract Sum unless stated in a separate <br />SHAW EWRONMENTAL, /Nc. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />01300-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.