Laserfiche WebLink
1 <br />C <br />ILI <br />n <br />0 <br />b. Schedules and Reports <br />D. Failure to comply with the submittal requirements is grounds for rejection of the <br />submittal without review of the submittal contents. <br />E. All submittals shall be in the English language. <br />F. The Contractor shall submit all submittals to the Engineer under a completed copy <br />of a standardized submittal form provided by the Engineer. <br />G. Engineer Review Time: <br />1. The Engineer will review submittals without deliberate delay. <br />2. Review time starts when the submittal is received by the Engineer and ends <br />when the reviewed submittal leaves the Engineer's office for delivery to the <br />Contractor. <br />3. The Contractor shall allow 10 working days for submittal review unless <br />otherwise allowed in the applicable Specifications or agreed to by the <br />Engineer. <br />H. Additional contract time will not be granted for re -review of submittals. <br />I. Technical and General Submittals shall be numerically serialized by type, Technical <br />Submittal with a "T" prefix (T-1, T-2, T-3, etc.), General Submittal with an "R" <br />prefix. <br />I The Contractor shall submit the number of copies of each submittal that the <br />Contractor requires to be returned, plus two (2) copies that will be retained by the <br />Engineer. <br />K. Each submittal shall be forwarded under a transmittal letter which shall include <br />reference to the specific project site(s) and identify the specific submittal. <br />L. Engineer Review Comments: <br />1. The Engineer's action on submittals will result in the making of one of the <br />following notations with related meanings, or equivalent: <br />a. Accepted Without Exceptions — The work involved may proceed, and no <br />further submission is required. <br />b. Accepted Subject to Comments — The work involved may proceed <br />providing submittal is corrected and resubmitted for record. Approval <br />does not authorize changes to Contract Sum unless stated in a separate <br />SHAW EWRONMENTAL, /Nc. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />01300-2 <br />