Laserfiche WebLink
r <br />r <br />C' <br />G <br />r <br />L <br />r. <br />r, <br />revision numbers, date, and calculation number. Where multiple number of <br />items are designed in a particular system, the calculations shall be preceded by <br />a table of contents. <br />2. Design Drawings: <br />a. When specified in the Specifications or the Construction Drawings, <br />design drawings shall be submitted to the Engineer for review. <br />b. Pertinent requirements of Article 1.02.13 of this Section shall be <br />applicable for submittal of design drawings. <br />G. Certificates of Compliance: <br />The Contractor may submit certificates of compliance for certain materials and <br />products in lieu of the specified sampling and testing procedures as specified in <br />each Specification section. Submit certificates required for demonstrating <br />proof of compliance of materials with specification requirements in duplicate <br />with each lot of material delivered to the Work. The lot so certified shall be <br />clearly identified by the certificate. Certificates shall be signed by an <br />authorized representative of the producer or manufacturer and shall state that <br />the material complies in all respects with the requirements of the Contract <br />Documents. In the case of multiple shipments, each shipment shall be <br />accompanied by a certificate of compliance. <br />2. The certificate of compliance shall be accompanied by a certified copy of test <br />results or shall state that such test results are on file with the producer or <br />manufacturer and shall be furnished to the Engineer on request. The certificate <br />shall give the information specified for samples per Paragraph C.5 above, the <br />name and address of the organization performing the tests, the date of the tests, <br />and the quantity of material shipped. <br />3. Materials used on the basis of a certificate of compliance may be sampled and <br />tested at any time. The fact that material is used on the basis of a certificate of <br />compliance shall not relieve the Contractor of responsibility for incorporating <br />material in the Work that conforms to the requirements of the Contract and any <br />such material not conforming to such requirements will be subject to rejection, <br />whether in place or not. <br />4. The Engineer reserves the right to refuse to permit the use of certain materials <br />on the basis of a certificate of compliance. <br />SHAW ENV/RONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />01300-6 <br />