Laserfiche WebLink
7 <br />6. Test samples, may be selected by the Engineer from the materials or equipment <br />delivered by the Contractor to the Site for use in the Work. If any test sample <br />fails to meet the Specification requirements, such materials or equipment that <br />fail the testing shall be removed and replaced by the Contractor with materials <br />or equipment meeting the Specification requirements. <br />7. Field samples shall be prepared at the site by the Contractor in the manner and <br />number as specified in these Specifications. Affected finish work shall not be <br />commenced until the Engineer has accepted the field samples, in writing. <br />D. Product Data: Each copy shall be marked to identify applicable products, models, <br />options, and other data; manufacturers' standard data shall be supplemented to <br />' provide information unique to the work. <br />E. Manufacturers' Instructions: When required by the manufacturer's warranty <br />requirements, the Contractor shall submit manufacturer's printed instructions for <br />delivery, storage, shelf life, assembly, installation, adjusting, and finishing. <br />F. Design Calculations and Design Drawings: <br />1. Design Calculations: When specified in the Specifications or the Construction <br />Drawings, design calculations shall be submitted to the Engineer for review <br />with all pertinent data, assumptions, objectives, criteria, applicable codes, <br />standards and references. The calculations shall be on 8-1/2 by 11 -inch or 11 <br />by 17 -inch sheets. Each design calculation set shall bear page numbers, titles, <br />SHAW ENVIRONMENTAL, INe. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />1 01300-5 <br />will review the samples for visual aspects such as kind, color, pattern, and <br />texture, and will accept or ask for resubmittal of samples. Acceptance will be <br />given by the Engineer in writing. <br />3. After the Engineer has performed his review and analysis of samples, two (2) <br />samples will be retained and the remaining sample will be returned to the <br />Contractor, with the Engineer's comments. <br />4. Samples shall be submitted and resubmitted until accepted as satisfactory. <br />Each change in manufacturing process or batch shall require submittal of <br />samples for acceptance. Acceptance of a sample shall not be taken in itself to <br />change or modify any Contract requirement. All materials, color, pattern and <br />texture used for construction shall be equal in every respect to that of the <br />approved samples. <br />5. Each sample shall be identified completely as to product, color, manufacturer, <br />trade name, lot, style, model, location of use, and Contract Document <br />reference, as well as the names of the Contractor, Supplier, Project, and <br />Owner. <br />6. Test samples, may be selected by the Engineer from the materials or equipment <br />delivered by the Contractor to the Site for use in the Work. If any test sample <br />fails to meet the Specification requirements, such materials or equipment that <br />fail the testing shall be removed and replaced by the Contractor with materials <br />or equipment meeting the Specification requirements. <br />7. Field samples shall be prepared at the site by the Contractor in the manner and <br />number as specified in these Specifications. Affected finish work shall not be <br />commenced until the Engineer has accepted the field samples, in writing. <br />D. Product Data: Each copy shall be marked to identify applicable products, models, <br />options, and other data; manufacturers' standard data shall be supplemented to <br />' provide information unique to the work. <br />E. Manufacturers' Instructions: When required by the manufacturer's warranty <br />requirements, the Contractor shall submit manufacturer's printed instructions for <br />delivery, storage, shelf life, assembly, installation, adjusting, and finishing. <br />F. Design Calculations and Design Drawings: <br />1. Design Calculations: When specified in the Specifications or the Construction <br />Drawings, design calculations shall be submitted to the Engineer for review <br />with all pertinent data, assumptions, objectives, criteria, applicable codes, <br />standards and references. The calculations shall be on 8-1/2 by 11 -inch or 11 <br />by 17 -inch sheets. Each design calculation set shall bear page numbers, titles, <br />SHAW ENVIRONMENTAL, INe. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Submittals <br />1 01300-5 <br />