Laserfiche WebLink
7 <br />''J <br />L' <br />C <br />C <br />r <br />[ 111 <br />L <br />C. Equipment and Personnel: The survey instruments and other equipment shall be <br />accurate, suitable for the surveys required in accordance with recognized <br />professional standards, and in proper condition and adjustment at all times. <br />(Surveys shall be performed under the direct supervision of a licensed surveyor). <br />D. Field Notes and Records: The survey work shall be recorded in field notebooks. <br />Copies of such records shall be furnished to the Engineer within 2 working days of <br />the work being performed. Each field notebook shall be furnished to the Engineer <br />when filled or completed. Electronic notes may be used if printouts are furnished to <br />the Engineer and if the format of the printed information is approved by the <br />Engineer. <br />E. Use by the Engineer: The Engineer may at any time use line and grade points and <br />markers established by the Contractor. The surveys are a part of the Work and may <br />be checked by the Engineer or representatives of the Engineer at any time. The <br />Contractor shall be responsible for (1) any lines, grades, or measurements which do <br />not comply with specified or proper tolerances, or which are otherwise defective, <br />and (2) for any resultant defects in the Work. The Contractor shall be to conduct <br />re -surveys or check surveys to correct errors indicated by review of the field <br />notebooks or otherwise detected. <br />1.03 SUBMITTALS <br />A. Survey Stakes/Marker Submittal: The Contractor shall submit to the Engineer for <br />review the type(s) of survey stake/marker proposed by the surveyor for all survey <br />locations within the limits of the final cover, and procedure to verify complete <br />removal if the stakes/markers could potentially damage the final cover geosynthetic <br />materials. <br />B. The Contractor shall submit to the Engineer for review the name and certification of <br />the California Licensed Land Surveyor to be used. <br />1.04 SURVEYS FOR LAYOUT, PERFORMANCE, MEASUREMENT, AND <br />VERIFICATION OF WORK <br />A. The Contractor shall be responsible for the performance of all surveys for layout, <br />performance, and verification of the Work, the field notes, necessary calculations, <br />and drawings necessary to carry out and verify such work as generally specified <br />below. <br />B. Top of Subgrade Grading and Verification Survey <br />1. For surveying purposes, "Top of Subgrade Grading" includes the top of soil <br />surfaces prepared for geomembrane cover placement. <br />tSHAW ENV/RONMENTAL, /NC, <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />Layout of Work and Surveys <br />1 01052-2 <br />